Monthly Archives: December 2009
Sorry i can’t upload properly – will sort out tomorrow. Nearly allow done now – so now just waiting!
All going well, rigging just started on the eye and barges in place.
All ok – weather looking fair.
Just about to finish getting everything together for tomorrow’s show. A bit worried about the weather see – www.xcweather.co.uk
Also look at
http://www.viewlondon.co.uk/whatson/london-eye-new-years-eve-fireworks-feature-1564.html

![20091231_007[1]](http://www.taksmith.me.uk/wp-content/uploads/20091231_0071-150x150.jpg)

![20091231_006[1]](http://www.taksmith.me.uk/wp-content/uploads/20091231_0061-150x150.jpg)
![20091231_004[1]](http://www.taksmith.me.uk/wp-content/uploads/20091231_0041-150x150.jpg)
![20091231_001[1]](http://www.taksmith.me.uk/wp-content/uploads/20091231_0011-150x150.jpg)
![20091231_002[1]](http://www.taksmith.me.uk/wp-content/uploads/20091231_0021-150x150.jpg)
![20091231_003[1]](http://www.taksmith.me.uk/wp-content/uploads/20091231_0031-150x150.jpg)